CloudGauge™ · CloudScape4ENT Phase 1

Know Before You Go.

Before you migrate a single workload to Azure — get a defensible blueprint. CloudGauge™ is a structured 4-6 week assessment that produces concrete answers: what moves, in what order, to what target architecture, at what cost.

4-6 Week Engagement 6 Structured Workshops 11+ Concrete Deliverables
Scroll
The Problem

Why Most Cloud Migrations Slip

When enterprises skip assessment and jump to migration, three things go wrong every time:

Surprise Costs

Azure bills come in 2-3× higher than estimated because workloads weren’t right-sized. The reserved instance plan was guesswork.

Stalled Migrations

Migration waves stall because no one mapped application dependencies. One late discovery blocks ten workloads.

Production Incidents

Apps move but break — no one identified the licensing, integration, or HA/DR gap until it was too late.

CloudGauge™ exists to eliminate all three. Before they happen.

11 Concrete Deliverables

What CloudGauge™ Produces

Not a slide deck. Not a “vision document.” Eleven specific, defensible artifacts your team can act on Monday morning.

01

Executive Summary

Board-ready overview of the migration strategy, key decisions, and recommended path forward.

02

Master Migration Inventory

60-column master sheet covering every VM, app, database, dependency, and sizing parameter.

03

VM Selection & Right-Sizing

Specific Azure VM SKUs mapped per workload — based on actual utilization, not capacity.

04

Target Landing Zone Architecture

Visualized subscription, networking, identity, and governance design — aligned to Microsoft CAF.

05

Migration Approach

Wave-by-wave plan with sequencing logic — what moves first, what moves last, and why.

06

Migration Solution Architecture

Technical diagrams for the migration process itself — tooling, cutover patterns, rollback paths.

07

R-Method Rationalization

Each workload categorized using the 7-R framework:

Rehost Replatform Refactor Rearchitect Rebuild Replace Retire Retain
08

HA/DR Architecture

Production resilience design with explicit RTO/RPO targets per workload tier.

09

Project Timeline

Phase-by-phase Gantt with dependencies, milestones, and critical path identified.

10

Project Team Structure

Roles, responsibilities, and RACI — for both Khoj and customer teams.

11

Cost Estimates

Infrastructure, software licensing, and professional services — broken down by phase.

Placeholder

Sample Deliverable Preview

Mockup of Master Migration Inventory or Landing Zone diagram

Replace: cloudgauge-deliverable-preview.png

Structured Engagement

Six Workshops. Twelve Hours of Your Team’s Time.

Across 4-6 weeks, your stakeholders join six focused workshops. We do the rest of the work.

01
1 hour Presentation Walkthrough

Kickoff

Team introductions, assessment scope, deliverables walkthrough, and confirmation of stakeholder commitments. We align on what success looks like before we start.

02
1-2 hours Deep Dive + Questionnaire

Current Infrastructure Analysis

Application server utilization analysis, target server sizing, and program execution review. We capture the truth of how your infrastructure actually runs — not what the org chart says it does.

03
1-2 hours Deep Dive + Questionnaire

Current Application Landscape

Systems, databases, and integration topology review. We map every dependency — including the ones nobody documented because “everyone just knows.”

04
1-2 hours Presentation + Whiteboarding

Architectural Design Session (ADS)

Enterprise architecture and target solution design. Where the Azure landing zone, networking, identity, and security architecture come together — with your architects in the room.

05
1-2 hours Presentation + Whiteboarding

Final Walkthrough

Migration approach, target architecture, timeline, licensing, and cost summary. By the end, your CFO and CIO are on the same page — with one document, not a slide deck war.

06
Parallel Khoj-Led Internal Reviews

Internal Reviews

Inventory analysis, dependency mapping, sizing calculations — the heavy lifting done by our team between your workshops. No additional time required from your stakeholders.

4-6

Weeks End-to-End

~12

Hours Stakeholder Time

11+

Concrete Artifacts

Tooling

What Powers CloudGauge™

Industry-standard discovery tools plus our proprietary automation. The same toolkit we’ve used on Fortune 500 SAP-on-Azure migrations.

Khoj Proprietary

CloudScape Automation Platform

Our proprietary tool auto-consolidates RVTools and Azure Migrate exports into wave plans and target architectures. Email-triggered automation handles VM lifecycle, snapshot cleanup, and orphaned disk detection — eliminating weeks of manual spreadsheet stitching.

Microsoft RVTools

Industry-standard VMware inventory tool. Captures full VM configuration data — CPU, memory, storage, network, snapshots, and host metadata — in a single export.

Azure Migrate

Microsoft’s official migration assessment service. We’re a Microsoft Solutions Partner with Advanced Specializations across SAP, Windows/SQL, and AVD — with direct Microsoft funding pathways.

Application Questionnaires

Structured deep-dive questionnaires for each application owner. Captures dependencies, integrations, licensing constraints, HA/DR requirements, and migration risks — in a format that maps directly into our Master Migration Inventory.

Fit Check

Is CloudGauge™ Right For You?

We’re upfront about who this fits and who it doesn’t. Save us both time.

Yes, if you:

  • Have 50+ VMs or 10+ enterprise applications on-prem
  • Are planning an Azure migration in the next 6-18 months
  • Need a defensible plan to present to your board or CFO
  • Want a fixed-scope engagement — no surprises, no scope creep
  • Run SAP, Oracle EBS, JDE, Epicor, or other ERP on-prem
  • Need HA/DR architecture validated before committing budget

Maybe not, if you:

  • Already have a detailed migration plan and just need execution help — see CloudShift™
  • Want to build greenfield workloads directly in Azure — see CloudErect™
  • Are already running on Azure and need optimization — see CloudBoost™

Not sure which engagement fits? Book a 30-minute discovery call — we’ll point you to the right one, even if it isn’t CloudGauge™.

Proof

CloudGauge™ in Action

Assessment-led migrations Khoj has executed at Fortune 500 scale.

CHOBANI SAP on Azure

Greek Yogurt Leader

Pre-migration assessment led to a full SAP on Azure transformation. Khoj continues as Microsoft partner across enterprise integrations.

Read case study
CAMPBELL’S SAP HANA

Global CPG Manufacturer

Assessment-led migration of a single global SAP HANA environment to Azure. Multi-region rollout with HA/DR architecture validated upfront.

Read case study
DFA SAP on Azure

Dairy Farmers of America

CloudGauge-style assessment preceded the full SAP on Azure migration. Defensible scoping kept the engagement on time and on budget.

Read case study
Common Questions

FAQ

The questions most enterprises ask before booking a CloudGauge™ discovery call.

Ready to Start?

Book a CloudGauge™ Discovery Call

30-minute call to scope your assessment. We’ll discuss your environment, timeline, and stakeholders — then send you a tailored proposal within 48 hours.

Free 30-min consultation · NDA available · Microsoft-funded engagements available for qualified customers